Get an instant ballpark estimate for your painting project in Hampstead and North London. Select your service, project size, area, and preferences below.
Step 1 of 5
Select the category that best describes your project.
Eight typical projects, priced with the same rates the calculator uses. Each is an indicative range for a specific property type, postcode, paint specification and surface condition — change any one of those and the number moves. We confirm the figure in writing after a free survey.
Interior Painting
West Hampstead NW6 · Dulux Trade · Good condition · 2–3 days
£750–£1,400
Indicative range, confirmed at survey
Interior Painting
Hampstead Village NW3 · Dulux Trade · Good condition · 1–2 weeks
£3,500–£6,500
Indicative range, confirmed at survey
Interior Painting
Hampstead Village NW3 · Dulux Trade · Good condition · 2–3 weeks
£5,500–£12,000
Indicative range, confirmed at survey
Interior Painting
Highgate N6 · Little Greene · Fair condition · 3–5 days
£2,000–£3,950
Indicative range, confirmed at survey
Exterior Painting
Kentish Town NW5 · Dulux Trade · Good condition · 1 day
£200–£450
Indicative range, confirmed at survey
Exterior Painting
Hampstead Village NW3 · Dulux Trade · Good condition · 2–3 weeks
£3,500–£10,000
Indicative range, confirmed at survey
Kitchen Cabinet Spraying
Belsize Park NW3 · Dulux Trade · Good condition · 5–7 days
£2,000–£3,500
Indicative range, confirmed at survey
Sash Window Restoration
St John's Wood NW8 · Dulux Trade · Good condition · 2–3 weeks
£3,150–£6,300
Indicative range, confirmed at survey
Where a project matches a band we publish on our pricing page, the calculator uses that exact band rather than a figure of its own.
Every band below assumes Dulux Trade paint, good surface condition and a Hampstead NW3 address. The three adjustment tables further down show how paint specification, surface condition and postcode move the figure.
Walls, ceilings, woodwork, doors & trim
| Project | Typical duration | Guide range |
|---|---|---|
| Single RoomBedroom, study or dining room | 2–3 days | £800–£1,500 |
| Living / Reception RoomIncluding cornicing and woodwork | 3–4 days | £1,200–£2,500 |
| Kitchen (walls & ceiling)Prep, prime and two coats | 2–3 days | £1,000–£2,000 |
| BathroomMoisture-resistant finishes | 1–2 days | £600–£1,200 |
| Hallway, Stairs & LandingMulti-level access required | 3–5 days | £1,500–£3,000 |
| 1-Bed Flat (full interior)All rooms, woodwork & ceilings | 1 week | £2,500–£4,500 |
| 2-Bed Flat (full interior)All rooms, woodwork & ceilings | 1–2 weeks | £3,500–£6,500 |
| 3-Bed House (full interior)All rooms incl. hallway & stairs | 2–3 weeks | £5,500–£12,000 |
| 4-Bed House (full interior)Period property with high ceilings | 3–4 weeks | £8,000–£15,000 |
| 5+ Bed House (full interior)Large property or townhouse | 4–6 weeks | £12,000–£22,000 |
Facades, masonry, render, windows & doors
| Project | Typical duration | Guide range |
|---|---|---|
| Front Facade OnlyTwo-storey terraced or semi | 1–2 weeks | £2,500–£5,000 |
| Front DoorStrip, prime and two coats | 1 day | £250–£500 |
| Window Frames (×10)Prep, prime and gloss | 3–5 days | £800–£1,500 |
| Full Terrace ExteriorFront and rear, all elevations | 2–3 weeks | £3,500–£10,000 |
| Full Semi-Detached ExteriorAll elevations | 2–4 weeks | £5,000–£10,000 |
| Full Detached ExteriorAll elevations, large property | 3–5 weeks | £8,000–£22,000 |
| Stucco / Render RestorationRepair, prep and masonry paint | 2–3 weeks | £3,000–£7,000 |
| Railings & MetalworkFront garden railings and gate | 1–2 days | £400–£900 |
Cabinet respraying, hand painting & refinishing
| Project | Typical duration | Guide range |
|---|---|---|
| Small Kitchen (8–12 units)Doors, drawers and frames | 3–5 days | £1,200–£2,500 |
| Medium Kitchen (12–20 units)Full cabinet respray | 5–7 days | £2,000–£3,500 |
| Large Kitchen (20+ units)Including island and dresser | 1–2 weeks | £3,000–£5,000 |
| Hand-Painted KitchenArtisan brush finish, heritage cabinetry | 1–2 weeks | £2,500–£4,500 |
| Bathroom Vanity UnitSpray or hand-painted finish | 1–2 days | £400–£800 |
Painting, repair, draught-proofing & cord replacement
| Project | Typical duration | Guide range |
|---|---|---|
| Single Sash Window (paint only)Prep, prime and microporous paint | 1 day | £200–£400 |
| 6 Sash Windows (paint only)Batch pricing | 3–4 days | £1,000–£2,000 |
| Single Sash (full restoration)Cord, timber repair, draught-proof, paint | 2–3 days | £600–£1,200 |
| 6 Sash Windows (full restoration)Complete overhaul | 2–3 weeks | £3,000–£6,000 |
| 12 Sash Windows (full restoration)Whole house | 3–5 weeks | £5,500–£11,000 |
| Bay Window (3 sashes)Restoration and painting | 1 week | £1,500–£3,000 |
Limewash, Keim, breathable coatings, listed buildings
| Project | Typical duration | Guide range |
|---|---|---|
| Limewash (per room)3–5 coats of traditional limewash | 3–5 days | £1,200–£2,500 |
| Limewash Exterior FacadeFull lime preparation and wash | 2–3 weeks | £3,000–£6,000 |
| Keim Mineral Silicate (facade)Substrate prep and Keim application | 2–4 weeks | £4,000–£8,000 |
| Listed Building RoomConservation-compliant decorating | 3–5 days | £1,500–£3,500 |
| Listed Building (full interior)Heritage specification throughout | 4–8 weeks | £8,000–£18,000 |
| Casein Distemper (per room)Traditional breathable finish | 2–3 days | £800–£1,800 |
Wallpaper, Venetian plaster, decorative effects
| Project | Typical duration | Guide range |
|---|---|---|
| Wallpaper Feature WallIncluding lining and hanging | 1 day | £400–£800 |
| Wallpaper Full RoomPattern matching, full hang | 1–2 days | £600–£1,400 |
| Designer Wallpaper (per room)Cole & Son, de Gournay, etc. | 2–3 days | £1,000–£2,500 |
| Venetian Plaster (feature wall)Multi-layer polished plaster | 3–5 days | £1,500–£3,500 |
| Venetian Plaster (full room)All walls, burnished finish | 1–2 weeks | £4,000–£8,000 |
| Microcement (bathroom)Seamless waterproof finish | 1–2 weeks | £3,000–£6,000 |
| High-Gloss Lacquer (joinery)Mirror-finish polyester lacquer | 1–2 weeks | £2,000–£5,000 |
Three adjustments are applied to the guide band above, then the result is rounded to the nearest £50. Nothing else is added: labour, materials, preparation, protection and clean-up are already inside the band. Scaffolding and specialist access for exterior work are quoted separately where they are needed.
| Paint | Adjustment |
|---|---|
| Dulux TradeProfessional | No adjustment |
| Little GreenePremium | +15% |
| Farrow & BallLuxury | +25% |
| Papers & PaintsSpecialist | +30% |
| Condition | Adjustment |
|---|---|
| GoodMinor prep needed | No adjustment |
| FairSome cracks & filling | +15% |
| PoorSignificant repairs | +35% |
Parking permits, access, storey heights and the prevalence of period detailing differ across our patch. Hampstead NW3 is the baseline.
| Area | Postcode | Adjustment |
|---|---|---|
| Hampstead Village | NW3 | No adjustment |
| Belsize Park | NW3 | No adjustment |
| Hampstead Heath | NW3 | No adjustment |
| Swiss Cottage | NW3 | -5% |
| Primrose Hill | NW3 | No adjustment |
| Frognal | NW3 | No adjustment |
| West Hampstead | NW6 | -8% |
| South Hampstead | NW6 | -5% |
| Highgate | N6 | No adjustment |
| St John's Wood | NW8 | +5% |
| Maida Vale | W9 | -2% |
| Golders Green | NW11 | -10% |
| Hampstead Garden Suburb | NW11 | -5% |
| Camden | NW1 | -10% |
| Kentish Town | NW5 | -12% |
| Tufnell Park | NW5 | -12% |
| Islington | N1 | -8% |
| Highbury | N5 | -12% |
Our calculator provides a realistic ballpark range based on completed projects across Hampstead and North London. Final pricing is confirmed after a free site visit where we assess the exact scope, surface conditions, access requirements, and your chosen specification.
All estimates include labour, paint and materials, surface preparation (filling, sanding, priming), furniture and floor protection, and full clean-up. Scaffolding for exterior work and specialist access equipment are quoted separately where required.
Pricing reflects local factors including parking permit costs, congestion charges, typical property sizes, access complexity, and the prevalence of period features. Hampstead Village and Belsize Park properties tend to have more ornate detailing that requires additional time and expertise.
For most projects, we can schedule a start date within 2–4 weeks of accepting a quote. Urgent void property turnarounds and smaller projects can often be accommodated within days. We always provide a clear timeline at the quoting stage.