Exterior work in NW3 is mostly render, stucco and masonry on pre-1919 buildings put together with flexible lime mortar, so the coating has to let the wall dry outwards. We begin with a moisture survey and a substrate assessment, pH test the plaster or masonry, and strip back any modern impermeable coating that is holding water in — that trapped moisture is usually what caused the blown render and the flaking you can already see. Friable surfaces are stabilised, then the specification follows the building: a breathable masonry coating or limewash on lime-based elevations, or Keim Granital mineral silicate where the facade needs to last. Keim, developed in Bavaria in 1878, works by silicification — the potassium silicate binder penetrates the masonry and forms a permanent chemical bond, so the finish is part of the wall rather than a film sitting on top of it. Every elevation is checked in raking light before the access comes down.
Masonry that has to dry
Exterior work on these streets is mostly render, stucco and masonry on buildings put together with lime. The coating has to let the wall dry outwards. The survey starts with moisture and with what is already on the face. An impermeable film that is holding water is a cause of the blown render and the flaking you can see. Friable material is stabilised. The specification then follows the building: a vapour-open masonry system or a limewash where the background is lime, and a mineral silicate such as Keim Granital only where the facade is sound and compatible. The origin story of that mineral system, and the way it bonds, is part of the exterior method. It is not copied onto a sash or onto an internal ceiling.
Roman cement stucco cracks because the background moves. Hairline crazing is opened and filled with something that can move. A hard, tight skin over an unopened crack stores water and draws the crack back through. Hollow stucco is sounded and the loose material comes off before a finish is discussed. Leaving a failed coating in place and painting again repeats the failure. South-west weather on an open edge near the Heath is harsher than a sheltered mews, so two houses on one street can carry two specifications. Previously painted London stock is recoated only after the old film is tested. Stock that has never been painted is a planning question in many of these conservation areas, not a colour question.
Metal gutters, railings and balcony iron are not bundled into the render price. They need their own preparation and their own coating. Rust bled through a masonry film is a stain the masonry product was not asked to stop. Rainwater goods are listed. A colour that floods a cornice or seizes a railing is a failure of cutting in, and tall elevations on Fitzjohn's Avenue, Frognal and Highgate West Hill make that cutting in slower than a ground-floor wall.
Joinery, access and the weather window
Exposed joinery, fascias, sills and sash frames are a separate schedule with their own primer and their own weather limits. Bare timber that has greyed is taken back to a sound face and primed. Waterborne exterior systems and alkyd systems both appear on these houses. The choice follows the existing coating and the exposure. Paint that rounds a glazing bar or fills a drip groove is too much film, even when the colour is right. If the sash needs new cords, new timber or rebalancing, that is the sash restoration page. Brushing the outside of a sound frame can stay in this exterior scope. The quotation should say which.
Access shapes the job more than the brand does. Multi-storey fronts, mansard roofs and basement lightwells need a scaffold or a tower, and sometimes a pavement arrangement. That cost is surveyed and shown as its own line rather than hidden inside a rate and then added later. Planted front gardens, common on Downshire Hill and in the Suburb, change how a tower bears. The Hampstead Garden Suburb Trust and Camden Article 4 Directions can also slow an external colour. The price is not only labour on the elevation. It is the time during which the specification is not allowed to change.
Application waits on a background that is not frozen or saturated, and on a forecast that lets the film form. The minimum temperature this site works to is the one already published with the exterior constants, not a higher bar invented to sound careful. Early autumn and late spring are often steadier than high summer on a south wall or a wet November. Mineral and limewash coats have their own wet edge. They are not a way to paint through driving rain. A programme that ignores that is a programme that will be stood down, and the quotation should not pretend otherwise.
How to compare an exterior quotation
Read it as a list of substrates. Render or stucco, brick and whether it is already painted, joinery, metal, and access. Each should have a preparation and a coating. A single line that says "front elevation" cannot be compared with a quotation that separates them. Ask which cracks are opened, whether a failed film comes off, and whether unpainted stock is being left alone. Ask where the scaffold sits in the figure. Bands on this page, where we publish them, are for a terraced or semi-detached house and for a large detached house, and they are planning figures confirmed by the survey. They are not a price for a lightwell, a mansard and a failed stucco combined.
Heritage coatings are the page when the product itself must be limewash, distemper or a vapour-open system on a delicate ground. This page is the elevation as a whole, including ordinary masonry systems where they are the right ones. Sash restoration is the frame as a mechanism. Use the outside and period hub if you are still deciding which of those three you are buying. Interior rooms behind the facade are the room decoration hub. The survey looks at the actual face before any of those bands becomes your figure.
Letting masonry dry while joinery takes a different film
Exterior coating is specified for the wall in front of the surveyor, not for a favourite product. Render, stucco, and fair-faced masonry on older London houses are often built with lime that expects to dry outward. A moisture reading and a simple alkalinity check inform whether the face is ready and what may sit on it. An impermeable film that is holding water is identified as a cause of failure, and the brief says whether it should come off before anything new is considered.
Where the background is lime, the specification leans toward limewash or another vapour-permeable masonry system, and it says so in plain words. Exposed joinery, including fascias, sills, and sash frames, is a separate schedule with its own primer and its own weather limits. Metal gutters and railings are not bundled with the render. Application conditions, such as frost, driving rain, and a hot sun on a south wall, are copied from the product sheet into the method. A colour panel on the elevation is part of approval, because a small card cannot show texture.
Exterior painting in Hampstead: brick, stucco and the scaffold licence
In 1976 an Article 4 Direction in Hampstead removed the right to paint the exterior brickwork of named listed buildings. The contrast between those brick fronts and the painted stucco houses is treated as part of the area's character, so a brick facade is identified before anyone specifies a masonry colour for it.
Camden's Hampstead guideline H19 says original brickwork should not be painted, rendered or clad unless that was the original treatment. A bare face stays bare in the quotation. Previously painted brick is a different item, because the film is already there and the next coating has to live with it.
Hampstead has mid-19th-century semi-detached villas with rusticated stucco on the ground floor, gault brick above, porticoes and tripartite sash windows. The stucco and the gault brick are written as two surfaces. A coating chosen for painted rustication is not automatically a coating for the brick storeys.
Scaffolding on the highway needs a Camden building licence. The council asks applicants to allow ten working days after they think the application has been received before they chase the permit number. A street elevation is programmed with that wait, not from the day the poles could theoretically arrive.
The Planning Portal says ordinary repainting of a house does not need planning permission. Listed buildings and Article 4 areas are the exceptions to check. In this conservation area those exceptions are confirmed before the colour is ordered, rather than assumed away because the work is "only paint".
How to arrange an exterior quotation
Tell us the street, whether the brick is still bare, and whether a scaffold would stand on the pavement. We look at the facade before the written quotation is issued. Request an exterior quotation.
Sources