Skip to main content
SPECIALIST SERVICE

Exterior Painting in Hampstead & North London

Protect your property against the British elements with coatings built to last

Exterior decorating and coating for render, stucco, masonry and exposed joinery, specified for the building rather than for the catalogue.

2 Years
Workmanship Guarantee
20
North London Postcodes
Fully insured
Certificates available on request
Within 24 hours
Enquiries Answered

Exterior work in NW3 is mostly render, stucco and masonry on pre-1919 buildings put together with flexible lime mortar, so the coating has to let the wall dry outwards. We begin with a moisture survey and a substrate assessment, pH test the plaster or masonry, and strip back any modern impermeable coating that is holding water in — that trapped moisture is usually what caused the blown render and the flaking you can already see. Friable surfaces are stabilised, then the specification follows the building: a breathable masonry coating or limewash on lime-based elevations, or Keim Granital mineral silicate where the facade needs to last. Keim, developed in Bavaria in 1878, works by silicification — the potassium silicate binder penetrates the masonry and forms a permanent chemical bond, so the finish is part of the wall rather than a film sitting on top of it. Every elevation is checked in raking light before the access comes down.

Painted stucco of this kind runs south into Primrose Hill, where Primrose Hill painters and decorators specify exterior coatings, and north towards the heath, where Highgate painters and decorators cover render, brick and joinery.

A failed render or a crack that needs building work, rather than another coat, sits with Hampstead Renovations. Where the facade should be investigated first, ask Hampstead Chartered Surveyors, our sister surveying and building consultancy firm to look before a coating is specified.

Masonry that has to dry

Exterior work on these streets is mostly render, stucco and masonry on buildings put together with lime. The coating has to let the wall dry outwards. The survey starts with moisture and with what is already on the face. An impermeable film that is holding water is a cause of the blown render and the flaking you can see. Friable material is stabilised. The specification then follows the building: a vapour-open masonry system or a limewash where the background is lime, and a mineral silicate such as Keim Granital only where the facade is sound and compatible. The origin story of that mineral system, and the way it bonds, is part of the exterior method. It is not copied onto a sash or onto an internal ceiling.

Roman cement stucco cracks because the background moves. Hairline crazing is opened and filled with something that can move. A hard, tight skin over an unopened crack stores water and draws the crack back through. Hollow stucco is sounded and the loose material comes off before a finish is discussed. Leaving a failed coating in place and painting again repeats the failure. South-west weather on an open edge near the Heath is harsher than a sheltered mews, so two houses on one street can carry two specifications. Previously painted London stock is recoated only after the old film is tested. Stock that has never been painted is a planning question in many of these conservation areas, not a colour question.

Metal gutters, railings and balcony iron are not bundled into the render price. They need their own preparation and their own coating. Rust bled through a masonry film is a stain the masonry product was not asked to stop. Rainwater goods are listed. A colour that floods a cornice or seizes a railing is a failure of cutting in, and tall elevations on Fitzjohn's Avenue, Frognal and Highgate West Hill make that cutting in slower than a ground-floor wall.

Joinery, access and the weather window

Exposed joinery, fascias, sills and sash frames are a separate schedule with their own primer and their own weather limits. Bare timber that has greyed is taken back to a sound face and primed. Waterborne exterior systems and alkyd systems both appear on these houses. The choice follows the existing coating and the exposure. Paint that rounds a glazing bar or fills a drip groove is too much film, even when the colour is right. If the sash needs new cords, new timber or rebalancing, that is the sash restoration page. Brushing the outside of a sound frame can stay in this exterior scope. The quotation should say which.

Access shapes the job more than the brand does. Multi-storey fronts, mansard roofs and basement lightwells need a scaffold or a tower, and sometimes a pavement arrangement. That cost is surveyed and shown as its own line rather than hidden inside a rate and then added later. Planted front gardens, common on Downshire Hill and in the Suburb, change how a tower bears. The Hampstead Garden Suburb Trust and Camden Article 4 Directions can also slow an external colour. The price is not only labour on the elevation. It is the time during which the specification is not allowed to change.

Application waits on a background that is not frozen or saturated, and on a forecast that lets the film form. The minimum temperature this site works to is the one already published with the exterior constants, not a higher bar invented to sound careful. Early autumn and late spring are often steadier than high summer on a south wall or a wet November. Mineral and limewash coats have their own wet edge. They are not a way to paint through driving rain. A programme that ignores that is a programme that will be stood down, and the quotation should not pretend otherwise.

How to compare an exterior quotation

Read it as a list of substrates. Render or stucco, brick and whether it is already painted, joinery, metal, and access. Each should have a preparation and a coating. A single line that says "front elevation" cannot be compared with a quotation that separates them. Ask which cracks are opened, whether a failed film comes off, and whether unpainted stock is being left alone. Ask where the scaffold sits in the figure. Bands on this page, where we publish them, are for a terraced or semi-detached house and for a large detached house, and they are planning figures confirmed by the survey. They are not a price for a lightwell, a mansard and a failed stucco combined.

Heritage coatings are the page when the product itself must be limewash, distemper or a vapour-open system on a delicate ground. This page is the elevation as a whole, including ordinary masonry systems where they are the right ones. Sash restoration is the frame as a mechanism. Use the outside and period hub if you are still deciding which of those three you are buying. Interior rooms behind the facade are the room decoration hub. The survey looks at the actual face before any of those bands becomes your figure.

Letting masonry dry while joinery takes a different film

Exterior coating is specified for the wall in front of the surveyor, not for a favourite product. Render, stucco, and fair-faced masonry on older London houses are often built with lime that expects to dry outward. A moisture reading and a simple alkalinity check inform whether the face is ready and what may sit on it. An impermeable film that is holding water is identified as a cause of failure, and the brief says whether it should come off before anything new is considered.

Where the background is lime, the specification leans toward limewash or another vapour-permeable masonry system, and it says so in plain words. Exposed joinery, including fascias, sills, and sash frames, is a separate schedule with its own primer and its own weather limits. Metal gutters and railings are not bundled with the render. Application conditions, such as frost, driving rain, and a hot sun on a south wall, are copied from the product sheet into the method. A colour panel on the elevation is part of approval, because a small card cannot show texture.

Exterior painting in Hampstead: brick, stucco and the scaffold licence

In 1976 an Article 4 Direction in Hampstead removed the right to paint the exterior brickwork of named listed buildings. The contrast between those brick fronts and the painted stucco houses is treated as part of the area's character, so a brick facade is identified before anyone specifies a masonry colour for it.

Camden's Hampstead guideline H19 says original brickwork should not be painted, rendered or clad unless that was the original treatment. A bare face stays bare in the quotation. Previously painted brick is a different item, because the film is already there and the next coating has to live with it.

Hampstead has mid-19th-century semi-detached villas with rusticated stucco on the ground floor, gault brick above, porticoes and tripartite sash windows. The stucco and the gault brick are written as two surfaces. A coating chosen for painted rustication is not automatically a coating for the brick storeys.

Scaffolding on the highway needs a Camden building licence. The council asks applicants to allow ten working days after they think the application has been received before they chase the permit number. A street elevation is programmed with that wait, not from the day the poles could theoretically arrive.

The Planning Portal says ordinary repainting of a house does not need planning permission. Listed buildings and Article 4 areas are the exceptions to check. In this conservation area those exceptions are confirmed before the colour is ordered, rather than assumed away because the work is "only paint".

How to arrange an exterior quotation

Tell us the street, whether the brick is still bare, and whether a scaffold would stand on the pavement. We look at the facade before the written quotation is issued. Request an exterior quotation.

Sources

What's Included

Render, stucco and masonry
Sash windows, joinery and railings
Breathable and mineral silicate coatings
Front doors, porches and garden joinery
Pressure washing and substrate cleaning

What's Not Included

Scaffold, towers and pavement licences are surveyed and shown as their own line. They sit inside the quotation you receive, not as a surprise after the decorating rate.
Render repairs, timber splicing and metal preparation beyond ordinary decoration are priced individually.
Damp paths and structural movement are flagged and left outside the coating scope until the right trade has dealt with them.

Access is part of the figure you accept, written as its own line so the decorating rate stays readable.

Our Exterior Painting Process

1

Pressure washing and cleaning down

2

Scraping & Sanding Loose Paint

3

Repairing Cracks & Wood Rot

4

Priming Exposed Surfaces

5

Application of Weather-Resistant Paint

6

Final Walkthrough

Request a Quote

You receive a detailed written quote within 24–48 hours of your survey.

How You're Protected

Fully insured

£5M public liability, £10M employers' liability and contractors' all risks insurance. Certificates are available on request.

2-Year Workmanship Guarantee

Our two-year workmanship guarantee covers our labour and application. Materials carry the manufacturer's own warranty. If our workmanship fails within that period, we return and put it right.

Finchley Road NW3 Base

The painting and decorating division of Hampstead Renovations, based at Unit 3 Palace Court, 250 Finchley Road, London NW3 6DN.

BEFORE YOU ENQUIRE

What Exterior Painting Costs and How Long It Takes

You receive a detailed written quote within 24–48 hours of your survey.

Guide prices and durations for exterior painting
ScopeGuide priceTime on site
Terraced or semi-detached house, full exterior£3,500–£10,0002–3 weeks
Large detached house, full exterior£8,000–£22,0003–5 weeks

Access sits inside these bands rather than arriving later as an extra. The survey settles whether the elevation needs a scaffold or a tower, and the quotation carries it as its own line.

Guide figures for planning, confirmed by the free survey. Whether VAT applies is stated on your written quotation.

How you pay

Under £2,000
Payment in full on completion.
£2,000 – £10,000
30% deposit, balance on completion.
Over £10,000
30% deposit, stage payments as agreed, final 10% on completion.

Working in your home

Our crews work 8:00am to 5:30pm, Monday to Friday, and Saturday mornings by arrangement.

Please remove small, fragile and valuable items from the rooms being decorated; we move larger furniture to the centre of the room, shroud it, and protect floors and fixtures.

THE HAMPSTEAD DIFFERENCE

Why Choose Us for Exterior Painting

An elevation is masonry, timber and metal, and each one takes a different film. The colour is the last decision, not the specification.

Comprehensive substrate assessment including moisture mapping and adhesion testing before any paint is applied

Specialist scaffolding and access solutions for multi-storey properties, mansard roofs, and basement lightwells

Weather-resistant coating systems selected to withstand North London's exposure, from masonry paint to microporous timber finishes

Full masonry repair, crack filling, and render patching integrated into the preparation programme

PREMIUM MATERIALS

Materials and Brands We Use

Masonry coatings, joinery coatings and metal coatings are written as separate systems. A single tin for render, sash and railings is how the next failure starts.

Dulux Weathershield
Sandtex
Zinsser
Sikkens
Teknos
Johnstone's Trade

Colour and finish for this specification

A colour panel is brushed on the elevation itself, in cloud as well as sun. A card in the hallway cannot show the texture of stucco.

COMMON QUESTIONS

Questions about Exterior Painting

Questions about masonry, access, weather and what the quotation should separate.

What gets its own line on an exterior quotation?

Masonry, joinery, metal and access. Render repairs and timber repairs are separate from the coating if the survey finds them. Scaffold or a tower is written as its own line inside the quotation, not added after you have accepted a decorating rate. Unpainted brick is either left unpainted or marked as waiting on a consent check. A single line for the whole front is not comparable with a quotation that splits those items. The survey is what fills the lines in for your elevation.

When do you refuse to coat a wall?

When it is saturated, frozen, or covered by a film that is holding water and has not been taken off. Hollow stucco is opened up rather than painted over. Bare London stock in a conservation area is not coated because the house next door is painted. A mineral silicate is not brushed over an old elastomeric coating that is already peeling. Those are specifications, not delays for their own sake. The programme moves when the background and the forecast allow the film to form.

Is painting the sash the same as restoring it?

No. Decorating the outside of a sound frame, including the cill and the exposed timber, can sit in an exterior scope. New cords, timber splices, rebalancing weights and failed glazing putty are restoration. Over-coating a meeting rail until the sash will not close is a decorating defect, not a restoration. If both are needed they are two lines, so you can do the masonry this season and the frames when the joinery is ready. The sash page describes the mechanism.

How should I look at an external colour?

On the elevation, in sun and in cloud, beside the brick or the stucco texture. A swatch indoors lies. Conservation areas and the Suburb Trust can limit what is allowed to change on the street, so the panel you like may still need the owner to confirm it. Joinery colour and masonry colour are often different. Agree both. The prettiest masonry colour is the wrong specification if it arrives as an impermeable film on a wall that still has to dry.

Do I need planning permission to repaint a house in Hampstead?

Ordinary repainting does not need planning permission, the Planning Portal says, but listed buildings and Article 4 areas are the exceptions to check. Hampstead's 1976 Article 4 removed the right to paint the exterior brickwork of named listed buildings, and guideline H19 says original brickwork should not be painted, rendered or clad unless that was the original treatment.

How long should I allow for a scaffold permit in Camden?

Camden's building licence covers scaffolding on the highway. Applicants are asked to allow ten working days after they believe the application has arrived before they ask for the permit number. The quotation should not assume painting can start the morning the scaffold is first discussed.

LOCAL GUIDES

Exterior Painting Advice for North London Homes

Exterior guides belong here when they discuss render, masonry or the weather window, rather than interior rooms.

EXPLORE MORE

Related services

Sash restoration and heritage coatings sit in the same hub because they share the elevation. They are not the same line on a quote.

Ready to Start Your Exterior Painting Project?

We reply to every enquiry within 24 hours.

Fully insured
2-Year Workmanship Guarantee
Talk to us

Tell us about your project

Share the work you have in mind and your property postcode. You can also contact us directly.

We use these details to respond to your enquiry. Read our privacy policy.