Heritage coatings on Redington Road
Heritage coatings on Redington Road follow the grade II* Philip Webb houses at Nos. 2 and 4, and masonry already held back by cement mortar pointing.
The earliest houses, and a grade II* pair
Some of the earliest houses in the area stand at the southern end of Redington Road, among them No. 6 and the Philip Webb pair at Nos. 2 and 4. Nos. 2 and 4 are listed grade II* under list entry 1245497. A grade II* designation marks a building of more than special interest, and it changes the order in which questions get asked: consent before specification, specification before materials, materials before a date in the diary. Nobody should be arriving at a front of that standing with a scraper and a general intention to freshen it up.
Further north, No. 54 is listed grade II under list entry 1130371 and No. 56 under list entry 1130372. Three list entries along one road, at two different grades, is a record worth writing down accurately rather than summarising as a listed street. The houses in between are unlisted, and they are not governed by listed building consent, but they sit in a conservation area whose character the listed fronts largely define, so what is right at Nos. 2 and 4 is usually good practice at No. 30 as well.
Cement pointing is the reason a heritage proposal here is often shorter, and the diagnosis belongs with Hampstead Chartered Surveyors, our sister surveying and building consultancy firm. Consent for work to a listed front is discussed by Highgate painters and decorators.
Why heritage work here often means doing less
Cement mortar appears to have been used in some building refurbishments in the Redington/Frognal Conservation Area, and Camden warns that cement mortar may have implications for the bricks by locking moisture in and leading to erosion. That warning is the backbone of heritage decorating on this road. A nineteenth century brick wall was built to let water in and then let it out again, through the mortar joints and through the face. Hard cement pointing closes the joints, so the moisture leaves through the brick instead, and the brick erodes.
Put a film-forming coating over a wall in that condition and the last escape route closes. This is why a heritage proposal on a cement-pointed front is often shorter than the one an owner was expecting: the recommendation is to leave the masonry alone, repair and redecorate the joinery and the metal, and raise the pointing as a separate matter for whoever handles the building fabric. A decorator who notices the mortar and says so is doing more for the wall than one who coats it beautifully.
Where a vapour-open coating does belong
The most prevalent walling materials in the conservation area are red brick, sometimes used together with render or tile hanging, and materials on the north part of Redington Road are predominantly red brick, terracotta and render. Render is the surface that was always finished, and it is the natural home for a breathable or mineral system: a coating that lets water vapour pass means the wall can dry outwards rather than pushing the finish off in plates. The choice is made after the render has been tapped, washed and examined, not from a sample card.
Terracotta and brick quoins are not candidates. Nor is tile hanging, which sheds water at the laps and dries between showers. Some boundary walls in the conservation area incorporate lava bricks and flint, and those decorative masonries are a feature rather than a substrate; they are washed down and left. Naming each of those exclusions in the written proposal is what stops a heritage specification quietly expanding to cover everything that happens to be outside.
Timber windows, and what age the frames are
Windows in the conservation area are mainly timber, with metal framed windows in some mid-20th century properties. On an early front at the southern end of the road, surviving timber is the thing most worth keeping, and keeping it is mostly a matter of putty, primer and patience. Where a section of a cill or a bottom rail has gone soft, a timber repair is preferable to a replacement unit, and it is specified as a repair rather than hidden in a decorating line.
On a mid-century property the frame may be metal, and that needs a different approach: corrosion cut back at edges and glazing rebates, a primer suited to metal, and no attempt to fill a rusting section as though it were wood. The useful discipline on a road this long is a window schedule that records material, style, number of lights and condition for each opening. It takes an hour on site and it prevents a whole category of argument later.
Paths, boundaries and the parts nobody lists
Front paths and footways in the conservation area have lost their traditional red or other tiling in some places, and are still losing it. A tiled path is easy to damage with a dropped scaffold board, a spilt tin or a wheeled skip, and it is almost impossible to replace convincingly. Where one survives, it is boarded and protected before anything else happens on site, and that protection is written into the method rather than left to goodwill on the morning.
The same goes for the boundary. Hedges, brick walls and the occasional lava brick or flint wall are the edges of these properties, and they are not working surfaces. A heritage specification for Redington Road should therefore read as a list of things that will be protected and left as they are, alongside the much shorter list of things that will be coated. On a street with two Philip Webb houses at one end, that balance is the whole point.
Heritage questions from Redington Road
What is different about working on Nos. 2 and 4?
Their grade. The southern end of Redington Road includes some of the earliest houses in the area, among them Nos. 2 and 4, designed by Philip Webb, and No. 6, and Nos. 2 and 4 are listed grade II* under list entry 1245497. A grade II* front means the consent position is established before the work is specified, the proposal is written to be read by a third party, and surviving fabric is repaired rather than replaced. No. 54 and No. 56 are listed grade II under entries 1130371 and 1130372.
Is a breathable coating the right answer for the brickwork?
Usually no coating at all is the right answer for the brickwork. Breathable and mineral systems belong on surfaces that were always finished, and on this road that means render, which appears alongside red brick and terracotta on the northern part. Sound facing brick, terracotta, brick quoins and tile hanging are left alone. Where the mortar has been renewed in cement, Camden warns it may lock moisture into the bricks and lead to erosion, and adding a coating to the face would make that worse.
How are the original front paths protected during the work?
By boarding them before anything is carried in. Camden records that traditional red or other tiling from front paths and footways has been lost in some places in the conservation area and continues to be lost, and a Victorian tiled path cannot be convincingly replaced. Protection of the path, the hedge and any lava brick or flint boundary wall is listed in the method statement alongside the painting, so the owner can see what will be covered and when it will be uncovered again.
Sources
Related reading
- Heritage and breathable coatings, and the surfaces they belong on
- Back to the Redington Road place page and its sourced facts
- Exterior painting on Redington Road, counted by pane rather than by opening
- Heritage coatings on Kidderpore Avenue and its listed Kings College buildings
- Heritage coatings on Fitzjohn's Avenue, where listings include walls and gates
- Decorating inside a Camden conservation area, in general terms
A heritage proposal for Redington Road names the list entries, says what will be protected rather than painted, and explains why a cement-pointed wall is left to breathe. Ask about a listed front on Redington Road.