Skip to main content

Sash window restoration on Belsize Park Gardens

Sash window restoration on Belsize Park Gardens, where recessed sashes diminish on each upper floor above canted three-light bays and porticoes.

Windows that shrink as the house rises

The Tidey villas have recessed sash windows that diminish in size on successive upper floors, with classically detailed surrounds. That diminishing sequence is not decoration; it is the device that makes a three-storey villa look taller and better proportioned than it is. It also means no two floors have the same window. A survey that measures the first floor and multiplies by three will order the wrong glass, the wrong cords and the wrong quantity of beading, which is why each opening is recorded on its own line with its own dimensions.

Recessed is the other operative word. A sash set back in its opening is sheltered from direct rain, which is one reason original windows here have lasted, and it is shaded, which is why the reveal and the bottom rail stay damp long after the wall face has dried. Moisture at the bottom rail is the usual starting point for decay in a sash of this period, so that is where the inspection starts rather than where it ends.

Sashes that diminish on each floor are kept rather than swapped, a point Primrose Hill painters and decorators also make about period joinery. Box and cill repairs beyond decoration sit with Hampstead Renovations.

The ground floor bay, and the doors beside it

The villas have canted three-light bays on the ground floor and steps up to porticoes. A canted bay puts three sashes in one projection, with angled mullions between them and a roof or cornice above, so the ground floor carries the densest concentration of joinery on the house. The angles are where sealant, putty and paint all meet, and they are where water finds its way in if any of the three has failed. Working a canted bay means working each light as its own window while keeping the finish consistent across the whole projection.

Among the other distinguishing features of a Tidey villa are curved glass bay windows at the rear, and front doors of two panels characteristically glazed with etched glass under rounded heads, the exception being the south side of Buckland Crescent. Curved glass cannot be matched off a shelf, so any work near a rear bay is planned around protecting it. An etched glass door panel is masked rather than relied on to clean up afterwards, and the ironmongery comes off so that the panel mouldings can be cut in properly.

Repair before replacement, and no plastic

Camden records that retained original detailing such as porticoes, door and window architraves, pediments, hoods and finials, eaves brackets, balustrading, cornicing, timber shopfront facades, iron balustrades, timber framed sash windows and doors adds to the visual interest of properties. Timber framed sash windows are named in that list, which puts them firmly in the category of things to keep. Camden also requires the original or closest possible natural materials and does not accept concrete roof tiles, artificial slate or PVCu windows.

So the order of work on a decayed sash is repair first. Failed putty is raked out and renewed. A soft section of bottom rail or cill is cut out and a new piece of matching timber let in, rather than the whole unit being condemned. Cords and the balance of the box are checked so the sash actually works, because a painted-shut window is a window that will be forced and broken later. Only when the joinery is sound does the finishing sequence begin.

How the painting is done once the joinery is sound

Camden's maintenance guidance is blunt and useful: routine maintenance such as unblocking gutters and rainwater pipes, repairing damaged pointing and stucco, and painting and repairing wood and metal work will prolong the life of a building and prevent unnecessary decay and damage. Painting is treated there as part of repair rather than as cosmetic, which is the right frame for sash work. Bare timber is primed, the surface is built up and rubbed flat, and the finish is taken a little onto the glass so water is shed away from the putty line.

The sash is eased so it runs, the staff bead is handled rather than painted into place, and the meeting rails are left able to close. Where a window has been shut for years, that easing is often the part of the job the occupant notices most. Nothing here needs a brand name or a figure for how long it will last, because both depend on the exposure of the particular elevation and on whether the gutters above it are kept clear.

Why the street makes consistency matter

These streets are characterised by the repeated forms of the stucco villas, whose design gives a strong identity and unity of appearance, and the closely spaced villas keep a continuous building line with repeated forms and narrow gaps that give a uniform rhythm and important glimpsed views. Windows are a large part of that rhythm. A pair of villas with matching diminishing sashes reads as one composition; the same pair with one house in a different glazing pattern reads as a mistake.

There are also views along the rear elevations of properties from adjoining streets in a number of locations, so the rear sashes and the curved rear bay are not private surfaces either. The practical conclusion is that a sash programme on this street is specified for the whole house and phased if it needs to be, rather than done one elevation at a time in different styles. Phasing by elevation is fine. Changing the pattern between phases is not.

Sash window questions from Belsize Park Gardens

Why are the upper floor windows smaller, and does it matter?

It matters a great deal. The villas have recessed sash windows that diminish in size on successive upper floors, with classically detailed surrounds, and that graduation is what gives the elevation its proportion. Because every floor is a different size, each opening is measured and recorded separately rather than scaled from one sample. Replacing an upper sash with a unit matched to the floor below would be visible from the pavement and would break the sequence the villa was designed around.

Can a decayed sash be repaired rather than replaced?

Usually, and Camden's guidance points that way. The council records that retained original detailing, which it lists as including timber framed sash windows, adds to the visual interest of properties, and it requires the original or closest possible natural materials while stating that PVCu windows would not be acceptable. In practice that means raking out and renewing failed putty, letting in new matching timber where a bottom rail or cill has gone soft, and checking the cords so the sash runs, before any painting starts.

What extra care do the bays and the front door need?

The bays are dense joinery and the door has glass in it. The villas have canted three-light bays on the ground floor and steps up to porticoes, and other distinguishing features include curved glass bay windows at the rear and front doors with two panels, characteristically of etched glass with rounded heads. Canted mullions are hand-cut work at an angle, curved glass cannot be replaced convincingly, and etched glass is masked and the door furniture removed rather than painted around.

Sources

Related reading

Sash work on Belsize Park Gardens is scheduled opening by opening, because the windows change size on every floor and the bay has three lights of its own. Ask about sash windows on Belsize Park Gardens.

Talk to us

Tell us about your project

Share the work you have in mind and your property postcode. You can also contact us directly.

We use these details to respond to your enquiry. Read our privacy policy.