Exterior painting on Netherhall Gardens

Exterior painting on Netherhall Gardens: six-storey fronts with no street canopy, Dutch gables and classical detail, and brickwork left as brickwork.

The tallest fronts take the most planning

Netherhall Gardens has larger-scale properties, many of them five to six storeys, and an exterior scheme on a front that tall is mostly a question of reach. The painted area may be modest, because the walls are brick, but every square metre of it sits above a level that a pair of ladders will serve. Deciding how the top two floors are reached is the first decision, not the last one, and it is taken on site with the owner. It also determines whether the work runs in one visit or in stages as access is moved.

Height interacts with exposure. There are very few street trees in Netherhall Gardens, and the verdant character is carried by trees and vegetation in private gardens, so the upper storeys have nothing above them. Rain driven onto an unshaded sixth-floor gable arrives with force, and summer sun on the same surface works on the film all day. A schedule that treats the top of the elevation as an afterthought will be repainting it long before the lower floors need touching.

Reaching the top of a six-storey elevation is the whole problem here, and Highgate painters and decorators cover access on steep ground. A facade that should be investigated before it is coated can go to Hampstead Chartered Surveyors, our sister surveying and building consultancy firm.

Brick stays brick, and that shrinks the painted area

The most prevalent walling materials across the conservation area are red brick and London yellow bricks, with occasional brown brick. On most fronts here, therefore, the wall is not in the painting contract at all. What is in the contract is the joinery, the metal, the rainwater goods and whatever render genuinely exists, and the measured quantity of that is far smaller than the elevation suggests.

It is worth being blunt about what that means for a figure. A six-storey brick front has a large apparent area and a small coated one, so the cost is driven by access and preparation rather than by paint. Owners who have been quoted by the square metre of elevation are usually surprised twice: once by how little is actually coated, and once by how much of the price is the means of getting to it. Both are honest consequences of a street built in brick.

Dutch gables, classical detail and the edges they create

Architecturally this is a mixed street: Queen Anne work, classical elements, Dutch gables and other influences stand side by side. Each of those puts edges in different places. A Dutch gable has a shaped profile with copings, returns and often a small pediment, so the cutting-in at the top of the wall follows a curve rather than a line. Classical elements bring pilasters, cornices and moulded window surrounds, which means more arrises, more internal angles and more places for water to sit. Mixed influences in one street mean the schedule is written per house.

Even the newer work answers to the same outline. The most recent development at No. 14 reflects the gables and modulation of the older properties without copying them, so the same vocabulary of projection and recession applies. Modulation is the practical word here: an elevation that steps forward and back has more surface, more returns and more shadow than its width implies. Measuring the flat width of a modulated front and calling it the area is the commonest way an exterior quotation goes wrong.

Timber, metal and the depth of the reveal

Windows across the conservation area are mainly timber, with metal framed windows in some inter-war and post-war buildings, so the first job on each floor is identifying which is which. Timber takes filling, priming and a flexible finish; metal needs corrosion dealt with at edges and glazing rebates before anything is applied, and it does not forgive a coat put straight over rust. On a street with buildings converted to other uses, both can appear on the same elevation, and the schedule should name them floor by floor.

The appraisal records that how far a window sits back in its opening is an important part of the building's character, so that degree of recession should be respected if windows are replaced. For painting, the reveal is where the delay comes from. A deeply recessed frame on a shaded side of a tall front dries slowly, and a coating applied into a damp reveal will blister at the bottom rail first. Moisture is checked, the reveal is given time, and the order of elevations follows what is dry.

Forecourts, steps and working around an occupied building

Among the harms recorded on Netherhall Gardens are unsympathetic hard-surfaced front parking courts at buildings converted to schools. Those forecourts are a working surface, not a storage yard, and a job in front of one has to fit around the hours the building is used. Pedestrian steps also lead from Finchley Road up to the Netherhall Gardens cul-de-sac, and the road inclines steeply from Finchley Road before wrapping around at its north end, so deliveries and plant movements need a route agreed in advance.

What follows is ordinary practice rather than anything proprietary. Surfaces are washed down and allowed to dry, loose material is cut back to a sound edge, bare timber is primed, defects are filled and rubbed flat, and metal is prepared on its own. Paths, planting and parked vehicles are covered before rubbing begins, and debris is collected at each level rather than dropped. On a tall front the discipline that matters most is working downwards, so that nothing falls onto a finished surface below.

Exterior painting questions from Netherhall Gardens

How much of a six-storey front is actually painted?

Less than owners expect. Netherhall Gardens has larger-scale properties, many of them five to six storeys, but the most prevalent walling materials in the conservation area are red brick and London yellow bricks, with occasional brown brick, and sound facing brick is left uncoated. The coated area is therefore the joinery, the metal, the rainwater goods and any genuine render. The price is driven by access and preparation rather than by the size of the wall.

Do the Dutch gables need a different approach from the lower floors?

They need a different allowance for time. The street is architecturally mixed, with Queen Anne work, classical elements, Dutch gables and other influences, and a shaped gable with copings and returns has a profile that has to be followed by hand. Added to that, there are very few street trees, so the top of the elevation is fully exposed. The combination of an intricate outline in the most weathered position is why gables are itemised rather than absorbed into a general figure for the front.

Can work be done while a converted school building is in use?

Usually, if the hours and the forecourt are agreed first. The appraisal records hard surfaced front parking courts at buildings converted to schools as harm to the street, and those courts remain in daily use. Access from Finchley Road includes a flight of pedestrian steps up to the cul-de-sac, and the road itself inclines steeply. Each of those is settled with the owner or managing agent before a start date, so the sequence of elevations can follow when each part of the site is free.

Sources

Related reading

An exterior price for Netherhall Gardens follows from how the top two floors will be reached, not from the width of the elevation. Book an exterior survey on Netherhall Gardens.

Talk to us

Tell us about your project

Share the work you have in mind and your property postcode. You can also contact us directly.

We use these details to respond to your enquiry. Read our privacy policy.